Single-section home
Foundation access, field documentation, engineering review and a stamped PDF report for a one-section home.
Most Utah lender foundation reports cost about $400–$750, depending on how many sections the home has, where it is, how easy the crawl space is to reach, and whether repairs need a return visit.
Lenders use many names for the same report. “Structural inspection,” “HUD engineering report,” “engineer’s letter,” “mobile home engineer inspection” and “FHA foundation certification” usually all mean one thing: a Utah-licensed engineer’s site-specific review of the home’s permanent foundation, not a full inspection of the house.
A single-section home typically runs $400–$600 and a multi-section or double-wide $500–$750. A modular-home engineer letter runs $450–$700, and a reinspection after repairs $200–$400. Every quote is a fixed fee with travel included, set in writing before anyone drives out.
Before you order, get the lender condition in writing. Ask your loan officer or underwriter for the exact wording of the report request. Similar phrases can hide different requirements, and the wording decides the scope and the fee.
These are Ludlow Engineering’s current planning ranges for standard lender foundation assignments. “Starting at $400” doesn’t mean every property is $400; configuration, distance, access and lender wording all affect the final fee.
Foundation access, field documentation, engineering review and a stamped PDF report for a one-section home.
Supports and connections across multiple sections, foundation review and a stamped report.
A site-specific foundation or lender-condition review for a modular home.
A return visit to verify corrections, with an updated engineer report.
Travel is built into the fixed fee. Homes far from Nephi are done by schedule and grouped with nearby work.
Engineering beyond the standard foundation report, such as additions or altered framing.
In most loan files, a “structural inspection” of a manufactured home means a focused engineering review of the permanent foundation. It doesn’t cover the roof, plumbing, electrical or HVAC, and it doesn’t replace a general home inspection or appraisal.
Two homes of the same size can have different fees. These are the variables we look at before we send your written proposal.
A double-wide or multi-section home takes more documentation of supports, connections and foundation conditions than a single-section home.
Travel is included in the fixed fee, but far-area homes are scheduled on days we already have work nearby, which can affect timing.
Locked skirting, small openings, standing water, unsafe wiring, animals or blocked crawl spaces can require a second trip.
A standard permanent-foundation certification differs from a request covering additions, modifications or broader structural concerns.
Porches, garages, decks or modified support systems may need extra documentation or separate engineering.
If the first visit finds deficiencies, the correction visit and updated report are normally a separate fee.
HUD writes the technical standard: the Permanent Foundations Guide for Manufactured Housing (Handbook 4930.3G), often shortened to PFGMH. HUD isn’t the lender. FHA, VA, USDA and conventional lenders each decide what documentation their loan file needs.
| Program | How it treats the report |
|---|---|
| HUD | Sets manufactured-housing standards and the foundation guide; not the lender. |
| FHA | A HUD mortgage-insurance program; needs a site-specific report signed by an engineer or registered architect licensed in the state where the home sits. A generic template letter won’t pass. |
| VA | Lenders often ask for a similar permanent-foundation report; the written condition controls scope. |
| USDA | Requirements vary by program; a noncompliant foundation may need retrofit before the loan proceeds. |
| Conventional | The underwriter may still want an engineer letter; standards vary by company. |
HUD states the FHA certification must be site-specific and include the licensed professional’s signature, seal and state license information. The sample above shows the six parts of a complete report.
| Included in the fee | What it means |
|---|---|
| Scope & lender-condition review | The engineer confirms the standard foundation assignment fits your lender’s request. |
| Site visit | Visible foundation, supports, anchorage and related site conditions are documented. |
| Photos & field notes | Observed conditions are recorded for engineering review and the loan file. |
| Professional Engineer review | A Utah-licensed PE evaluates the findings against the defined criteria. |
| Signed & stamped PDF | The site-specific report is delivered electronically. |
| Basic lender clarification | Reasonable questions about the issued report, within the original scope. |
Foundation repairs or contractor labor, opening inaccessible skirting, utility locating or excavation, and design of a new foundation or major retrofit.
A general home inspection of roof, plumbing, electrical or HVAC; reinspection after corrections unless stated; and calculations for additions or altered framing.
These examples show how the pieces combine. They’re planning illustrations, not fixed quotes, and repair work is priced by your contractor.
| Scenario | Planning total | What’s in it |
|---|---|---|
| Single-section, clear access | $400–$600 | Standard lender request, central Utah, accessible crawl space, no correction visit |
| Far-area double-wide, by schedule | $500–$750 | Multi-section inspection; travel included, visit grouped with nearby work |
| Inspection plus reinspection | $600–$1,150 | First report finds corrections, contractor repairs, engineer returns (before repair cost) |
| Expanded structural request | Custom quote | Lender also asks about additions, altered framing or a nonstandard foundation |
A deficiency report is a repair roadmap, not necessarily the end of the loan. The engineer identifies the condition, a contractor fixes it, and the engineer returns to verify and update the report.
Straps, anchors or connections may be absent, deteriorated, loose or not configured as required.
Loose blocks, shifted piers, damaged members or unsupported areas can interrupt the load path.
Standing water, negative grading or chronic moisture can affect support soils and materials.
The engineer can’t certify what can’t be safely observed. This delays the report rather than failing it.
Attached rooms, garages or decks may add loads or connections that need separate documentation.
Corrosion, displaced supports, settlement or damage may require repair and verification.
| Remediation cost layer | Who provides it | Planning treatment |
|---|---|---|
| Initial engineer inspection | Ludlow Engineering | $400–$750 |
| Repair design, if required | Engineer | Separate proposal when the fix needs engineered details |
| Foundation or anchorage repair | Qualified contractor | Contractor quote based on the condition |
| Access correction | Owner or contractor | Clear obstructions, water or unsafe conditions |
| Engineer reinspection | Ludlow Engineering | $200–$400 |
If the first visit finds anchorage or support problems, you’ll need time for a contractor and a reinspection before closing. USDA, for example, notes that a manufactured-home foundation can be retrofitted to meet its guidelines, but the loan guarantee can’t be issued until the retrofit is complete.
Repairs, weather, far-area scheduling, unsafe access or missing lender information can stretch the schedule. Confirm rush availability before relying on a tight closing date.
Address, home sections, loan type, contacts and the exact lender condition.
Scope, fixed fee and scheduling defined before you authorize. Usually within one business day.
Access coordinated with the owner, agent or occupant. Often 3–7 days.
Supports, anchorage, enclosure, drainage and identifiers are recorded.
PE review and signed, stamped PDF, typically in 5–10 business days.
Real work by town and year, without client names.
From Mount Pleasant and Nephi to Moab and Torrey.
Most second trips are avoidable. A few minutes of preparation before the visit keeps the fee and the schedule where you expect them.
Forward the exact underwriter condition so the scope is right before we travel.
Number of sections, approximate year, and HUD labels or data-plate details if available.
Unlock access and clear stored items, animals, standing water and electrical hazards.
Earlier engineer reports, foundation plans, repair invoices, permits, and any additions.
The standard lender foundation report answers one question for the loan file. Broader site grading, drainage or utility concerns may need separate civil engineering.
Licensed in Utah, in one office in Nephi.
Civil engineer · Ludlow Engineering
Brett leads our structural and foundation engineering, including repair details when a first inspection finds problems.
Professional Land Surveyor · Utah No. 5331527
When a lender also needs the lot surveyed, or the home placed against setbacks, Daryl’s crew handles it from the same office.
Meet the whole team, or read our story since 1975.
Ludlow Engineering's standard manufactured-home foundation report typically runs $400–$600 for a single-section home and $500–$750 for a multi-section home. Location, access and scope set the final proposal.
A common name for a site-specific report from a licensed engineer on the manufactured home's permanent foundation. HUD's technical reference is the Permanent Foundations Guide for Manufactured Housing, Handbook 4930.3G.
No. In lender terms, "structural inspection" usually means the permanent-foundation report, focused on supports, anchorage and visible foundation conditions.
FHA and many other lenders need proof the home sits on a permanent foundation that meets HUD's guide before they'll insure or fund the loan. The engineer's stamped report is that proof.
The foundation review may be similar, but each lender's written condition controls. Send the exact request before ordering so the report addresses your transaction.
Not for FHA. HUD requires a professional engineer or registered architect licensed in the state where the home is located.
Commonly $200–$400 for the return visit and updated report. Contractor repair costs are separate and depend on the condition found.
Site visits are often scheduled within 3–7 days, and the stamped report typically follows in 5–10 business days. Repairs, travel or access problems can add time.
HUD guidance indicates an existing FHA foundation certification may be acceptable for a future FHA loan if there have been no alterations or observable damage. The new lender still decides.
Missing labels are a separate identification issue from the foundation condition. Tell your lender and engineer early so it can be addressed.
References: HUD Permanent Foundations Guide for Manufactured Housing (Handbook 4930.3G); HUD Manufactured Homes, Foundation Compliance; HUD Manufactured Housing Certification Labels; USDA Rural Development Single Family Housing Loan Origination FAQ.
Send the address, number of home sections, loan type and your lender’s exact condition. We’ll confirm the scope, fee and next available visit.
Ludlow Engineering has surveyed and engineered Utah property for 51 years. Every survey and plan is prepared under a licensed professional, not handed off.
Professional EngineerState of Utah
Stamps our site plans, foundation designs and civil engineering.
Professional Land SurveyorState of Utah No. 5331527
Directs our boundary, topographic, ALTA and subdivision surveys.
Partner & Managing MemberMBA
Managing Member of Ludlow Engineers and Associates
67 foundation inspection projects since 2000, in 7 Utah counties.
Most recent: Aug 2023.
Counts come from Ludlow Engineering's project records (2000–present, updated Oct 2026). Client names are never shown.