Ludlow Engineering logo, representing a land surveying company in Utah, associated with land survey cost variations and related services.

ALTA Survey Cost Utah: Lender & Title Pricing

ALTA cost guide · Updated October 2026

ALTA Survey Cost in Utah: What Lenders Expect, and What Drives the Price.

Most Utah ALTA/NSPS surveys run $3,000 to $8,000; large and complex sites run more. Here’s what moves the price, which Table A items cost the most, what lenders and title companies need, and three real 2026 ALTAs from our files, from surveyors who have completed 170 since 2000.

Ludlow Engineering 2026 ALTA/NSPS land title survey of an apartment site in Tooele, Utah
A 2026 ALTA from our files · Tooele County
The short answer

How Much Does an ALTA Survey Cost?

In Utah, most ALTA/NSPS land title surveys cost $3,000 to $8,000. Small commercial lots usually fall at the low end; standard 2- to 10-acre commercial sites in the middle; and large tracts, resorts, multifamily and industrial sites above $8,000. The biggest drivers are the Table A items your lender selects, the amount of improvements and parking, the number of title exceptions, and how hard the boundary evidence is to recover.

Most take three to six weeks from receipt of the full title commitment.

  • Typical range$3,000–$8,000+
  • Biggest addsItems 11, 5, 9 and 7
  • Typical time3–6 weeks
  • Standard2026 ALTA/NSPS, effective Feb 23, 2026
01 · Pricing

ALTA Survey Cost by Property Type (2026)

Planning ranges from our Utah work. Your quote is a fixed fee for your property and Table A list, with travel shown separately.

PropertyTypical costTypical timeNotes
Small commercial lot, under 2 acres$3,000–$5,5003–4 weeksSingle building, simple parking, recent plat.
Standard commercial, about 2–10 acres$5,000–$8,0003–5 weeksSeveral buildings or larger parking areas.
Large rural or vacant tracts$8,000+4–6 weeksSection-corner recovery, contours, long boundaries.
Multifamily, resorts, industrial$8,000+4–6+ weeksMany buildings, plats, stalls and exceptions.
Item 11 underground utilitiesQuotedAdds timePrivate locator plus survey of markings.
02 · Cost drivers

What Drives the Cost of an ALTA Survey

Ranked by how much they usually move the price.

FactorImpactWhy
Table A itemsHighEach item adds field time, research or drafting. Item 11 (underground utilities), Item 5 (contours) and Item 9 (parking) move the price most.
Site size and complexityHighAcreage matters, but buildings, parking, curbs and utilities matter more. A busy 3-acre site can cost more than an empty 20-acre one.
Title commitment & Schedule BMediumEvery exception document is reviewed and plotted. A commitment with 25 old easements takes longer than one with five.
Boundary evidenceMediumRural tracts need section corners recovered first. Missing or conflicting monuments add field days.
Number of parcels and platsMediumSeveral recorded plats, condo projects or “less and except” parcels on one survey, like a resort, add research and drafting.
DeadlineMediumA closing next week means reshuffling crews. Order as soon as you have the title commitment.
Zoning information (Item 6)LowerThe surveyor shows zoning from a report or letter you provide. Ordering that report is a separate cost.
TravelLowerShown as its own line. We’re in Nephi, within about three hours of most of Utah.
03 · Table A

Table A Items and What They Add to the Cost

Every Table A item is optional unless a lender, law or regulation requires it. Choose them before the proposal is final.

ItemWhat it isCost impactNotes
1Monuments set at cornersLowerUsually small; more on acreage with many corners.
2–4Address, flood zone, land areaLowerLittle added cost. Almost always ordered.
5Contours / vertical reliefHighA full topographic survey of the site.
6(a)/(b)Zoning and setbacksLowerLow survey cost; the zoning report is separate.
7Building dimensions, area, heightMediumDepends on the number and shape of buildings.
8Substantial featuresMediumScales with how much is on the site.
9Parking countsMediumLarge lots take real field time. 450 stalls on one 2026 job.
11Underground utilitiesHighPrivate locator and extra fieldwork. Often the biggest single add.
13–14Adjoiners, nearest intersectionLowerMostly office research.
16–18Recent earthwork, ROW changes, offsite easementsMediumItem 18 can add significant research.
19Professional liability insuranceLowerA certificate, unless the lender wants unusual limits.
20Encroachment summary table (new 2026)MediumDrafting time; worth it on busy sites.

Full descriptions and a printable checklist: 2026 Table A checklist.

04 · Lenders & title

What Lenders and Title Companies Expect

Three reviewers read the same survey for different reasons. Scope it for all three.

Lender

Collateral, access and certification

That the property, improvements and access match the loan, material encroachments are disclosed, the Table A items they require are included, and the survey is certified to them (and their successors and assigns, if requested) using the 2026 wording.

Title company

Exceptions plotted, boundary clear

Every plottable Schedule B exception shown or explained, the boundary tied to the record description, and access and encroachments documented, so the survey exception can be removed or limited.

Buyer

What you’re actually buying

Limits, buildings, parking, easements, zoning and flood zone, before closing, when problems are cheapest to fix.

05 · From our files

Three Real 2026 ALTAs, and Why Each Cost What It Did

Three surveys we signed this year under the 2026 standard. Each landed in a different part of the range for different reasons. Click a drawing to see it full size.

ALTA/NSPS survey of a two-lot apartment site in Tooele, Utah
Section 17, T3S R4W, SLB&M · click to enlarge
Standard-to-large commercial

Tooele multifamily, 10.66 acres

What drove the cost: two lots, the apartment buildings and a clubhouse to dimension (Item 7a), 450 parking stalls to count by type (Item 9), a dozen Schedule B easements and plat notes to plot, and the new Item 20 encroachment table. Little boundary uncertainty, so the effort went into improvements.

Table A items
  • 2
  • 3
  • 4
  • 6(a)
  • 6(b)
  • 7(a)
  • 8
  • 9
  • 13
  • 16
  • 18
  • 20
ALTA/NSPS survey of 310 acres in Juab County, Utah
Sections 26, 27, 34 & 35, T13S R2W · click to enlarge
Large rural tract

Juab County land, 310 acres

What drove the cost: section-corner recovery across four sections, rebar set at every corner (Item 1), 2-foot contours over 310 acres (Item 5), three transmission-line easements and utility evidence (Item 11). Almost no buildings, so the effort went into boundary and terrain.

Table A items
  • 1
  • 2
  • 3
  • 4
  • 5
  • 8
  • 11(a)
  • 11(b)
  • 13
  • 18
ALTA/NSPS survey of a resort in Midway, Utah
Section 17 · Midway, Wasatch County · click to enlarge
Complex resort

Midway resort, 15 acres

What drove the cost: several recorded resort plats and condominium projects, water rights, a conference center, hotel and villas, 412 parking stalls, zoning from a city letter, and drone mapping of the whole site. Moderate acreage, but many parcels and improvements.

Table A items
  • 4
  • 5
  • 6(a)
  • 7(a)
  • 7(b)(1)
  • 8
  • 9
  • 13
  • 16
  • 18
  • 20
06 · Five decades of lessons

How to Keep an ALTA Survey on Budget

What 170 ALTA surveys since 2000, and Utah boundary work since 1975, have taught us about where ALTA budgets go wrong.

Lesson 01

Fix the Table A list before you sign.

Adding Item 11 or Item 5 after the crew has left means a second trip. Get the lender’s list in writing first.

Lesson 02

Send the whole title commitment.

Missing exception documents are the most common cause of delay and change orders. Send Schedule B and every recorded document it lists.

Lesson 03

Share the prior survey.

An older ALTA or boundary survey, even a decade old, shortens research and helps the crew find corners faster.

Lesson 04

Order early on rural land.

Section corners on acreage can take days to recover, and snow can stop the search. Order rural ALTAs before the closing date is tight.

07 · Direct answers

ALTA Survey Cost Questions, Answered.

How much does an ALTA survey cost in Utah?

Most ALTA/NSPS surveys we quote run $3,000 to $8,000. Small commercial lots usually fall between $3,000 and $5,500, standard 2- to 10-acre sites between $5,000 and $8,000, and large tracts, resorts, multifamily and industrial sites above $8,000, quoted by scope.

Why does an ALTA survey cost more than a boundary survey?

An ALTA includes a boundary survey plus review and plotting of the title commitment's exceptions, the improvements on the site, the Table A items the lender selects, and a prescribed certification to the lender and title insurer.

Does acreage determine the price?

It's one factor. Improvements, parking, the number of title exceptions and the Table A list often matter more. A busy small site can cost more than a large empty one.

Which Table A items cost the most?

Item 11 (underground utilities) and Item 5 (contours) usually add the most, followed by Item 9 (parking counts), Item 7 (building dimensions) and Item 18 (offsite easements) on complex sites.

Who chooses the Table A items?

The client, usually with the lender, title company and attorney. Get the lender's list in writing before the proposal is final; adding items after fieldwork costs more.

How long does an ALTA survey take?

Usually three to six weeks from receipt of the full title commitment and its exception documents.

Can an older survey lower the cost?

Often. A prior ALTA or boundary survey shortens research and fieldwork, but the new survey must meet the 2026 standard and current conditions.

Do all lenders require the same thing?

No. Requirements vary by lender, loan program and transaction. Send us the lender's survey requirements with the title commitment.

Is topography included?

Not unless Table A Item 5 is ordered.

What do you need for a quote?

The address or parcel numbers, the title commitment with Schedule B documents, the lender's Table A list, certification parties and your closing date.

Related: ALTA surveys in Utah · 2026 ALTA standards explained · ALTA surveys in Utah County · drone ALTA surveys · all survey costs

Licensed Utah surveying · Since 1975

Get a Fixed Fee Before You Commit.

Send the address, your lender’s Table A list and the title commitment. We’ll confirm the 2026 scope and send a fixed fee, usually within one business day.

Who's behind this page

Licensed Utah Surveyors & Engineers Since 1975.

Ludlow Engineering has surveyed and engineered Utah property for 51 years. Every survey and plan is prepared under a licensed professional, not handed off.

Daryl Penrod

Professional Land SurveyorState of Utah No. 5331527

Directs our boundary, topographic, ALTA and subdivision surveys.

J. Brett Ludlow

Professional EngineerState of Utah

Stamps our site plans, foundation designs and civil engineering.

Travis Ludlow

Partner & Managing MemberMBA

Managing Member of Ludlow Engineers and Associates

Since 197551 years, family-run in Nephi
5,606projects tracked since 2000
1,200+survey maps filed with Utah counties
19 countiesacross Utah where we've worked

Our ALTA/NSPS survey record

170 ALTA/NSPS survey projects since 2000, in 14 Utah counties.

Most recent: Sep 2026.

Where we do this work most
Utah County38
Salt Lake County27
Sanpete County19
Juab County19
Uintah County9
Recent projects
  • ALTA/NSPS surveyMidway, Wasatch County
  • ALTA/NSPS surveyEmery, Emery County
  • ALTA/NSPS surveyEmery, Emery County
  • ALTA/NSPS surveySalt Lake City, Salt Lake County
  • ALTA/NSPS surveyMount Pleasant, Sanpete County

Counts come from Ludlow Engineering's project records (2000–present, updated Oct 2026). Client names are never shown.