Ludlow Engineering logo, representing a land surveying company in Utah, associated with land survey cost variations and related services.

Condominium Design and Platting Services in Utah

Condominium Design and Platting Services in Utah
4.977 Google reviews Condominiums · Townhomes · Planned units · Utah

Condominium Design & Platting in Utah. Every Unit, Measured in Three Dimensions.

Condo plats, site plans and surveys for new condominium and townhome projects, conversions of existing buildings, and properties built on older condo plats. Licensed Utah surveyors and a Utah PE in one office, since 1975.

Unit 201 Unit 101 Common hall & stair Limited common balcony, 201 Ceiling 5,021.4′Floor 5,012.6′Ceiling 5,011.9′Floor 5,003.1′ Building section · elevations illustrative
The short answer

What Does a Condominium Plat Do?

A condominium plat turns one property into individually owned units plus common areas. Unlike a subdivision, it defines each unit in three dimensions: its walls and its floor and ceiling elevations. Recorded with the declaration under Utah’s Condominium Ownership Act, it lets each unit be sold and financed on its own.

We survey the site, help engineer it, draft the plat from the architect’s plans, and field-verify the finished building so the recorded plat matches what was built.

  • ProjectsCondos, townhomes, conversions
  • DefinesUnits, common & limited common areas
  • Starts withA boundary survey, from $1,025
  • Signed byUtah PLS & PE
01 · The plat

What a Condominium Plat Shows

Everything a buyer, lender and title company need to identify each unit.

Horizontal

Unit boundaries

Each unit’s walls located and dimensioned, tied to the property boundary.

Vertical

Floor & ceiling elevations

Upper and lower unit boundaries as elevations, so each unit is a defined three-dimensional space.

Shared

Common areas

Hallways, grounds, parking and amenities owned by all owners together.

Assigned

Limited common areas

Balconies, patios, garages or parking stalls reserved for one unit.

Record

Boundary & easements

The outer boundary, recorded easements and any phases or convertible land.

Certification

Surveyor’s certificate

Signed and sealed by a Utah Professional Land Surveyor for recording with the county.

02 · The process

From Bare Lot to Recorded Units

Six steps, with the survey at both ends: before design and after construction.

Step 01

Boundary & site survey

Establish the outer boundary and map existing buildings, utilities and easements.

Step 02

Site plan & engineering

Building placement, parking, grading, drainage and utilities for city approval.

Step 03

Draft the condo plat

Units, common and limited common areas, laid out from the architect’s plans.

Step 04

Field-verify the building

After construction, we measure the as-built walls and floor elevations so the plat matches what was built.

Step 05

Coordinate the declaration

Unit numbers and areas line up with the declaration your attorney prepares.

Step 06

Record

The signed plat and declaration are recorded with the county, and units can be sold individually.

03 · From our files

Condo, Resort and Multifamily Work

From our records, without client names. Click either image to enlarge it.

Ludlow Engineering ALTA/NSPS survey of a 15-acre Midway, Utah resort spanning several resort and condominium plats
The survey · click to enlarge
Drone orthomosaic of the same Midway resort flown by Ludlow Engineering
Our drone map of the site · click to enlarge
Condo plats on a survey · Midway · 2026

A Resort Built on Several Recorded Plats

A conference center, hotel, villas and 412 parking spaces spread across several recorded resort and condominium plats. Untangling which plat governs which building, and showing it all on one drawing checked against our drone map, is the same skill a new condo plat needs: every unit, common area and boundary has to agree with the record.

  • 14.99 acResort property
  • SeveralResort & condo plats
  • 412 stallsParking counted
  • DroneOrthomosaic
  • Plat research
  • Boundary
  • Buildings
  • Drone imagery
  • EphraimPine Tree Condos on Block 13, Plat A of the Ephraim city survey.
  • EphraimA site plan and condominium subdivision plat in Section 4, T17S R3E.
  • Midway · 2026An ALTA/NSPS survey of a 15-acre resort spanning several recorded resort and condominium plats.
  • Tooele · 2026An ALTA/NSPS survey of a multifamily site with apartment buildings, a clubhouse and 450 parking stalls.
  • Saratoga SpringsSurvey work for a planned unit development.
  • Orem · 2026Structural engineering for a townhome project.
04 · Lessons

What Keeps a Condo Plat Clean

Most condo plat problems come from plans and buildings that don’t quite match.

Lesson 01

Measure the building as built.

Walls move during construction. A plat drawn only from the plans can give a buyer square footage they don’t have.

Lesson 02

Decide on limited common areas early.

Who gets which parking stall, patio or storage unit should be settled before the plat is drafted, not after units are sold.

Lesson 03

Plan the phases.

Projects built in phases need the plat and declaration set up for later buildings from the start.

Lesson 04

Keep the plat and declaration in step.

Unit numbers, areas and allocations must match exactly between the plat and your attorney’s declaration.

Related: subdivision design & platting · subdivision plat guide · site planning · ALTA surveys · easements

05 · Direct answers

Condominium Platting Questions, Answered.

What is a condominium plat?

A recorded drawing that divides a building or project into individually owned units plus common areas. It shows each unit's horizontal boundaries and its floor and ceiling elevations, so each unit is a defined three-dimensional space that can be sold and financed on its own.

How is a condo plat different from a subdivision plat?

A subdivision plat divides land into lots. A condominium plat divides a building, or a project of buildings, into units in three dimensions, with common and limited common areas shared by the owners.

What Utah law governs condominiums?

Utah's Condominium Ownership Act, in Title 57, Chapter 8 of the Utah Code, along with your city's or county's subdivision and zoning rules. Your attorney prepares the declaration; we prepare the survey and plat that go with it.

When is the condo plat finished?

Usually after the building is built. We draft the plat from the architect's plans, then measure the as-built walls and floor elevations so the recorded plat matches what was actually constructed.

Can you convert an existing building or townhomes into condos?

Often, yes, subject to zoning and building approvals. We survey the existing building, measure the units and prepare the plat. Talk with the city early about parking, fire separation and other requirements.

How much does a condominium plat cost?

It depends on the number of units, buildings and phases, so we quote each project by scope. The boundary survey that starts the process runs from $1,025 for a recorded lot, and larger sites more.

We’re licensed surveyors and engineers, not attorneys. Your condominium declaration and legal questions belong with a Utah real estate attorney.

Utah PLS & PE · Since 1975

Planning Condos or Townhomes?

Send the parcel number, the number of units and buildings, and any architect’s plans. We’ll quote the survey, engineering and condo plat as a fixed fee.

Who's behind this page

Licensed Utah Surveyors & Engineers Since 1975.

Ludlow Engineering has surveyed and engineered Utah property for 51 years. Every survey and plan is prepared under a licensed professional, not handed off.

Daryl Penrod

Professional Land SurveyorState of Utah No. 5331527

Directs our boundary, topographic, ALTA and subdivision surveys.

J. Brett Ludlow

Professional EngineerState of Utah

Stamps our site plans, foundation designs and civil engineering.

Travis Ludlow

Partner & Managing MemberMBA

Managing Member of Ludlow Engineers and Associates

Since 197551 years, family-run in Nephi
5,606projects tracked since 2000
1,200+survey maps filed with Utah counties
19 countiesacross Utah where we've worked

Our subdivision & platting record

529 subdivision & platting projects since 2000, in 5 Utah counties.

Most recent: Oct 2026.

Where we do this work most
Sanpete County279
Juab County131
Utah County74
Millard County14
Sevier County1
Recent projects
  • Subdivision & plattingNephi, Juab County
  • Subdivision & plattingFillmore, Millard County
  • Subdivision & plattingNephi, Juab County
  • Subdivision & plattingEphraim, Sanpete County
  • Subdivision & plattingSpring City, Sanpete County

Counts come from Ludlow Engineering's project records (2000–present, updated Oct 2026). Client names are never shown.

Leave a Reply

Your email address will not be published. Required fields are marked *