New homes, additions & ADUs
Building location, setbacks, driveway, grading and utility connections for the building permit.
Permit-ready site plans for homes, commercial buildings and subdivisions: boundary, layout, grading, drainage, utilities, access and parking, designed on our own survey and stamped by a Utah PE. 142 site plans since 2000, and residential site plans from $1,500.
A civil site plan is an engineered drawing of how a proposed building or development fits a specific parcel. It's more than a footprint: it resolves setbacks and easements, access and parking, grading and drainage, and water, sewer and utility connections, so the city can approve it and the contractor can build it.
We survey the site first, design on that survey, and stake it for construction, so nothing gets lost between firms.
From a single-lot addition to a commercial site or subdivision.
Building location, setbacks, driveway, grading and utility connections for the building permit.
Buildings, parking and accessible spaces, fire access, drainage and utilities for city review.
Truck access, pads and grading on larger, flatter sites.
Lot yield, streets, access and utility service tested before final engineering.
Finished elevations and runoff, stand-alone or as part of a full site plan.
Facilities for cities, counties and state agencies, including curb, gutter and water lines.
Site planning is constraint solving: setbacks, easements, slope, access, utilities and stormwater decide the buildable area before architecture does.
Legal lines and corners, from our own boundary survey.
Topography, buildings, fences, trees and existing utilities.
Where the building goes and how far it sits from every line.
Driveways, parking, accessible stalls and fire access.
Finished floor, finished grades and where runoff goes.
Connection points, routes and conflicts, with notes, details and the PE stamp.
The survey base comes from our boundary surveys and topographic surveys.
Most of our site plans are in Utah County (49), Sanpete (36) and Juab (35), with 82 more civil design jobs alongside them. A sample of recent work, without client names.
A commercial subdivision laid out for access, lot frontage and utility service along Nephi's Main Street. The same office surveyed the ground, designed the layout and prepared the plat, so the lots that were planned are the lots that were recorded.
You work directly with the engineer, and the survey crew is down the hall.
Partner & Civil Engineer · Professional Engineer, State of Utah
Brett designs and stamps Ludlow's site plans, grading and drainage, subdivisions, water and sewer, and foundations. He has served as engineer of record on state and federal facilities in Nephi, Castle Dale and Price, including Workforce Services, Family Services and USDA facilities, and on public work for Nephi City such as water line extensions.
More: civil engineering · our team
Feasibility is tested before final engineering, and the design carries straight through to construction staking.
Legal lines, contours, existing utilities and easements.
Lot yield, access, grading and utility service, before final design.
Stamped site, grading, drainage and utility plans for city or county review.
Construction staking from the same control the design used.
Habits that save a round of comments, or a change order in the field.
A layout drawn on a county parcel map can be several feet off. Designing on a real boundary and topo avoids redesign after the first review.
The sewer depth at the street decides where the house can sit. We pick up rims and inverts during the topo, not after the plan is drawn.
Most review comments on small sites are about drainage. We show where runoff goes and how it stays on site, before the city has to ask.
Every Utah city has its own checklist. We read it before we draw, so the first submittal answers it.
Planning ranges. Every quote is a fixed fee in writing; boundary and topographic surveys can be quoted separately or together with the design.
| Project | Scope | Typical cost |
|---|---|---|
| Residential site plan | New home, addition, ADU or similar on an existing lot | $1,500–$3,500 |
| Small commercial | Generally under 1 acre, one primary building | $3,000–$7,500 |
| Medium commercial | About 1–5 acres, more parking, grading or utilities | $6,500–$15,000 |
| Large commercial / industrial | 5+ acres or complex grading, stormwater and utilities | $12,000–$35,000+ |
| Grading & drainage plan | Stand-alone, existing property | $2,000–$6,500 |
| Subdivision engineering | Lots, streets, utilities, drainage, plat coordination | Quoted by scope |
| Boundary / topographic survey | If no current survey exists | From $1,025 / $1,500 |
Related: civil engineering · subdivision design & platting · construction staking · flood elevation certificates · drone mapping
Most residential site plans for a new home, addition or ADU run $1,500 to $3,500. Small commercial sites under about an acre run $3,000 to $7,500, medium commercial sites of 1 to 5 acres $6,500 to $15,000, and large commercial or industrial sites $12,000 to $35,000 or more. Stand-alone grading and drainage plans run $2,000 to $6,500. Surveys may be billed separately, or quoted together with the design.
The property boundary, existing contours and improvements, building location and setbacks, access, drives and parking, grading and finished elevations, drainage, water, sewer and utilities, and the notes, details and PE stamp the city requires.
Usually. A site plan is only as accurate as the boundary and topography under it. We do both, so the survey and the design come from one team.
If the site has any slope, drainage question or grading, yes. Cities often require finished elevations, which have to be designed from existing ones.
A residential site plan usually takes two to four weeks once survey data is available; a commercial site plan four to eight weeks before city or county review. Review times vary by jurisdiction.
Many Utah cities and counties require a Utah Professional Engineer's stamp on grading, drainage and utility plans. Our plans are stamped by J. Brett Ludlow, PE, where required.
Yes. That's the main reason clients come to us: boundary, topo, site plan, civil design and construction staking from one office.
Yes, from concept and lot yield through streets, utilities, drainage and the recorded plat. See our subdivision design page.
The address or parcel number, what you plan to build, any architect's drawings, the city's requirements or review comments, and any survey you already have. Our quote form takes uploads.
Yes. We respond to city and county review comments and revise the plans; the number of included revision rounds is set out in the quote.
Send the address, what you plan to build and the city's requirements. Attach any drawings or surveys. We'll send a fixed fee for the survey and the site plan, usually within one business day.
Ludlow Engineering has surveyed and engineered Utah property for 51 years. Every survey and plan is prepared under a licensed professional, not handed off.
Professional EngineerState of Utah
Stamps our site plans, foundation designs and civil engineering.
Professional Land SurveyorState of Utah No. 5331527
Directs our boundary, topographic, ALTA and subdivision surveys.
Partner & Managing MemberMBA
Managing Member of Ludlow Engineers and Associates
142 site plan projects since 2000, in 10 Utah counties.
Most recent: Oct 2026.
Counts come from Ludlow Engineering's project records (2000–present, updated Oct 2026). Client names are never shown.